Kyushu Electric Opens Nuclear Fuel Loading Process

SATSUMASENDAI, JAPAN - JULY 08: A fuel rod (black object) is inserted into the reactor containment at the No.1 reactor building of the Kyushu Electric Power Co's Sendai nuclear power plant on July 8, 2015 in Satsumasendai, Kagoshima, Japan. The Nuclear Regulation Authority gave the plant operator the green light to start loading the fuel into the No. 1 reactor after the nuclear watchdog inspected the plant's equipment on July 3. The reactor is planned to be restarted in mid-August after Kyushu Electric undergoes a month-long preparation. (Photo by The Asahi Shimbun via Getty Images)
SATSUMASENDAI, JAPAN - JULY 08: A fuel rod (black object) is inserted into the reactor containment at the No.1 reactor building of the Kyushu Electric Power Co's Sendai nuclear power plant on July 8, 2015 in Satsumasendai, Kagoshima, Japan. The Nuclear Regulation Authority gave the plant operator the green light to start loading the fuel into the No. 1 reactor after the nuclear watchdog inspected the plant's equipment on July 3. The reactor is planned to be restarted in mid-August after Kyushu Electric undergoes a month-long preparation. (Photo by The Asahi Shimbun via Getty Images)
Kyushu Electric Opens Nuclear Fuel Loading Process
PURCHASE A LICENCE
How can I use this image?
AED 1,850.00
AED

DETAILS

Restrictions:
Contact your local office for all commercial or promotional uses.
Credit:
The Asahi Shimbun / Contributor
Editorial #:
480038296
Collection:
The Asahi Shimbun
Date created:
08 July, 2015
Upload date:
Licence type:
Release info:
Not released. More information
Source:
The Asahi Shimbun
Object name:
86144149
Max file size:
1997 x 3000 px (16.91 x 25.40 cm) - 300 dpi - 2 MB